Case Studies / Whitepapers
Case Study 1 – Damage/Asbestos Resolution
When making a delivery of building materials to a domestic property, a hydraulic support leg from a heavy goods vehicle punctured the tarmac highway located to the side of the third party's property.
Case Study 2 – Consideration of Third Party Costs
When completing a delivery to the property in question, the client’s vehicle reversed into the third party's garden wall, causing structural damage.
First Floor, 2 Barnston Lane, Moreton, Wirral, CH46 7TP.
The Building Repair Network is the trading style of The Building Repair Network Limited, a limited company registered in England and Wales with registration number 9360925.
Registered Office: First Floor, 2 Barnston Lane, Moreton, Wirral, CH46 7TP.
© 2018 | The Building Repair Network | Privacy Policy